Charlene standing next to one of the pilings which will be one side of the garage door opening.
|
|
|
|
SIL Dana Thompson up on the ladder tightening down the 'go-bolts'. You can see one hanging down in front of the piling...
|
|
|
|
A good view of both octagons. You can see that we've finished the sheathing.
|
|
|
|
Charlene checking the level of the top of the spiral stairwell.
|
|
|
|
Friend Ron cutting back the kneewall around the spiral staircase opening...
|
|
|
|
|
Ron's idea of a smile!
|
|
|
|
Dana taking his turn on the masonry bit...Damn that's hard concrete.
|
|
|
|
Hamming it up...
|
|
|
|
With Ron and Dana lowering the treads onto the support pole, I manned the ladder to lower them. The pole is just under 16' tall, 4.5" in dia.
|
|
|
|
Almost the last tread...too bad the landing was wrong! We would have finished up the stair today.
|
|
|
|
|
Me. On the ladder lowering one of the treads...
|
|
|
|
Looking down the spiral staircase opening.
|
|
|
|
Looking up from the outside wall toward the kitchen.
|
|
|
|
Standing behind the kitchen island.
|
|
|
|
Looking from the hall into the master bedroom thru the pocket door.
|
|
|
|
|
A good look at 2 of the pocket door frames Dana and I installed this morning.
|
|
|
|
Looking toward the bedroom down the pantry/wet bar wall.
|
|
|
|
This shot shows the 'go-bolt' system. You see 4 of the bolts (2 on each side of the corner between the big sliding door and one of the window walls.
|
|
|
|
The small octagon's views aren't too shabby...
|
|
|