Blocks delivered and setup started.
This is looking thru the front door of the large octagon utility core. The finished wall will be 15 blocks high. I'm standing on a stack of block to get this shot.
This is generally the direction of the view from the main kitchen looking out toward the northeast.
This is the opening for the dumbwaiter. I'm standing on top of the blocks again. You can see the plumbing rough ins.
This puts my eye at a foot or two below the finished floor level of the house. This is the direction of the general view from the dining room.